-Set of accessories used to obtain partial exemption from supervised operation (24 h) in accordance with legal requirements.
-Composition: pipe stub for instrument connection with flanged connections to be attached to the boiler outlet, complete with the following accessories:.
-1 pressure gauge with connection valve.
-1 large dial thermometer with limit indicator.
-1 safety pressure switch.
-1 reflex level gauge with on-off valves.
-1 minimum level safety probe.
-2 sets of temperature switches.